    Project founder Thorsten Försterling tells us that the team is working on a track-installed machine that will be able to lift individual pods off of one rail and place them on the other (without passengers in them at the time), keeping them from all collecting at either end of the route.

    Still sounds dumb to me. How much effort would it be to lay down a second track, rather than invent a gyroscope-balanced pod that can propel itself along a single railroad rail, along with a specialized machine to move it over to the other rail?

    • poVoqOPM
      link
      fedilink
      127 months ago

      Just dealing with with land rights for the extra space the second track would need is a nightmare. And the very idea of these is to use existing tracks without getting into new track construction.