Solar power and storage prices have dropped almost 90%::undefined

  • @[email protected]
    link
    fedilink
    English
    29 months ago

    It’s mostly just time consuming. It took 5 days to get the solar installed on our roof.

      • @[email protected]
        link
        fedilink
        English
        39 months ago

        21 panels and very simple layout. The longest part was building the frame to hold the panels. Installing the inverters etc. took a little time and our town is a little strict when it cones to construction. This is a very good installer which doesn’t rush things just to move on to the next job.