(water is wet and fire is hot).

      • Final Remix
        link
        fedilink
        109 months ago

        He probably thinks a 32-hour week means jobsites just close down entirely.

    • @[email protected]
      link
      fedilink
      199 months ago

      Studies have shown that total productivity goes up if we work eight less hours. Those last eight hours lower economic output.

      • @[email protected]
        link
        fedilink
        19 months ago

        Most jobs no it doesn’t. Everyone would be doing it and splitting the difference if it did. Good luck with that one.

          • @[email protected]
            link
            fedilink
            19 months ago

            It would be done in a second if there was value to it. Especially large companies as often there are bonuses based on profits. Or do you actually think directors and CEOs would rather make less personal income?

            It is goofy that people actually think productivity would remain the same when working far less hours and believe the same number of houses (or insert any product here) would be built. Or that a pilot test would remain accurate if the people involved in it did not know it was a simple experiment. Tell me if those companies that experienced more productivity, why did they not continue to implement it?

            • @[email protected]
              link
              fedilink
              29 months ago

              Tell me if those companies that experienced more productivity, why did they not continue to implement it?

              they did. 80% of them did exactly that!

              it works exactly as expected, and the companies that did switch to a 32h-week model did see increased productivity, and 80% chose to keep the 32h-week model.

              read the study.