[T]he report’s executive summary certainly gets to the heart of their findings.

“The rhetoric from small modular reactor (SMR) advocates is loud and persistent: This time will be different because the cost overruns and schedule delays that have plagued large reactor construction projects will not be repeated with the new designs,” says the report. “But the few SMRs that have been built (or have been started) paint a different picture – one that looks startlingly similar to the past. Significant construction delays are still the norm and costs have continued to climb.”

  • @[email protected]
    link
    fedilink
    English
    156 months ago

    Are you German? That’s standard German rethoric and the reason, they shut off their reactors prematurely. It’s not how the world sees it though.

    • @[email protected]
      link
      fedilink
      English
      106 months ago

      No. I’m not German. We run our reactors as long as possible because free money is free money ;)