• Badabinski
      link
      fedilink
      1
      edit-2
      22 days ago

      I’m genuinely interested in how government involvement increases the cost. I honestly don’t know. Like, is it dealing with zoning and permitting? I hope my good-faith intent is coming through here, I’m not just trying to bait an argument.

      • @[email protected]
        link
        fedilink
        122 days ago

        Sure, if you are actually interested I can give you some basic examples. Lets take a look at some of the site details for a new build. Need to remove X yards of dirt - may require an engineer report. Ever see 100 yards of sidewalk/curb/gutter in the middle of no where - city requriement that will add $15k just for the concrete, let alone what you would need for retaining walls if there is a slope. If there is a mild slope to the lot - may need a different engineering report. Big developement - they will require land set aside that cant be developed for a wide varieties of things.