• @[email protected]
    link
    fedilink
    274 months ago

    Requests for available meeting times. I figure if I drag my feet on scheduling a meeting someone urgently wants to have they’ll eventually just email the fucking questions and save us both 90 minutes of pointless bullshit.

    I actually made an online meeting request process with a minimum 2-week turnaround just to make scheduling meetings with my department annoying. I only have so much time, and if I honored all requests I’d be spending 60+ hours a week in meetings and none actually doing my job.

    • @[email protected]
      link
      fedilink
      34 months ago

      In a project manager. Meetings are my job. If I made my customers wait two weeks to schedule a meeting, I’d be fired. Two weeks to hold it? Maybe. Two weeks to schedule? No.

      • @[email protected]
        link
        fedilink
        54 months ago

        Could you perhaps cut down on the number of meetings you have? I’ve found that 99% of meetings I get invited to could usually have been an email or a slack message, but then people just want to waste time talking to make it look like they’re doing stuff instead of actually just doing stuff.