    There’s also a reliability element too. Nuclear can reliably output a given amount of energy, at the cost of being slow to alter. Many renewable sources have sporadic amounts of power throughout each day. Either is better than fossil fuels at least.

    • Giddy
      link
      fedilink
      English
      11 year ago

      Good point but that is not insurmountable. There are many ways to achieve predictability (batteries, hydro, tidal) that also come on stream much quicker than any nuclear plant.

    • @[email protected]
      link
      fedilink
      English
      -11 year ago

      Nuclear isn’t entirely reliable though. During the big heatwave last year at least 1 and iirc at leat a few French reactors had to be shut down because the water levels in the rivers they were on were not high enough to get sufficient water to cool them. Which is a problem that’s only going to get worse as climate change progresses.

      • @[email protected]
        link
        fedilink
        English
        6
        edit-2
        1 year ago

        That’s a limitation of the secondary power conversion side and is true for any power generation methodology that relies on steam generation. That said, there’s alternatives to the traditional Rankine cycle that could be deployed without modifying the nuclear side of the plant.