@[email protected] to There Was An [email protected]English • 3 months agoto unload 100 tons of steelfiles.catbox.moemessage-square31fedilinkarrow-up1178
arrow-up1178playto unload 100 tons of steelfiles.catbox.moe@[email protected] to There Was An [email protected]English • 3 months agomessage-square31fedilink
minus-square@[email protected]linkfedilinkEnglish10•3 months agoI would have lifted up, then pulled the train out, then lowered and pulled manageable quantities.
minus-square@[email protected]OPlinkfedilinkEnglish17•edit-23 months agoActually, everything should be done by crane, but I guess management told them to use the forklifts cuz getting and assembling one on site costs a lot.
minus-square@[email protected]linkfedilinkEnglish4•3 months agoDoes a crane cost more or less than this fuck up?
minus-square@[email protected]OPlinkfedilinkEnglish6•3 months agoNo, but tell that to Bob from management, who is not an engineer. I’ve been in situations like that. You just don’t do it. Also, explain why in written form and have that stamped and submitted.
minus-squareGithyankilinkfedilinkEnglish1•3 months agoI’m going to say less. They can do it by hand now!
minus-square@Good_morninglinkEnglish3•3 months agoAlso, at the very least, should’ve had forklifts on opposite sides
I would have lifted up, then pulled the train out, then lowered and pulled manageable quantities.
Actually, everything should be done by crane, but I guess management told them to use the forklifts cuz getting and assembling one on site costs a lot.
Does a crane cost more or less than this fuck up?
No, but tell that to Bob from management, who is not an engineer.
I’ve been in situations like that. You just don’t do it. Also, explain why in written form and have that stamped and submitted.
I’m going to say less. They can do it by hand now!
Also, at the very least, should’ve had forklifts on opposite sides