@[email protected] to There Was An [email protected]English • 15 days agoto unload 100 tons of steelfiles.catbox.moemessage-square31fedilinkarrow-up1177
arrow-up1177playto unload 100 tons of steelfiles.catbox.moe@[email protected] to There Was An [email protected]English • 15 days agomessage-square31fedilink
minus-square@[email protected]linkfedilinkEnglish10•15 days agoI would have lifted up, then pulled the train out, then lowered and pulled manageable quantities.
minus-square@[email protected]OPlinkfedilinkEnglish17•edit-215 days agoActually, everything should be done by crane, but I guess management told them to use the forklifts cuz getting and assembling one on site costs a lot.
minus-square@[email protected]linkfedilinkEnglish4•14 days agoDoes a crane cost more or less than this fuck up?
minus-square@[email protected]OPlinkfedilinkEnglish6•14 days agoNo, but tell that to Bob from management, who is not an engineer. I’ve been in situations like that. You just don’t do it. Also, explain why in written form and have that stamped and submitted.
minus-squareGithyankilinkfedilinkEnglish1•14 days agoI’m going to say less. They can do it by hand now!
minus-square@Good_morninglinkEnglish3•14 days agoAlso, at the very least, should’ve had forklifts on opposite sides
I would have lifted up, then pulled the train out, then lowered and pulled manageable quantities.
Actually, everything should be done by crane, but I guess management told them to use the forklifts cuz getting and assembling one on site costs a lot.
Does a crane cost more or less than this fuck up?
No, but tell that to Bob from management, who is not an engineer.
I’ve been in situations like that. You just don’t do it. Also, explain why in written form and have that stamped and submitted.
I’m going to say less. They can do it by hand now!
Also, at the very least, should’ve had forklifts on opposite sides